6 x 5 MW power generation units
The performance test was conducted on a Turbomach Taurus 70 turbogenerators operated in simple cycle (5 MW each).
Reference codes: ASME PTC 22, UNI EN ISO 3744
Main scopes of the performance test:
- Power output
- Heat rate
- Sound pressure level
- Uncertainty calculation
In additions to the performance test on each unit, Sint Technology was in charge to conduct the calculation of power output and power losses for the entire power station.


